Lampson 2250 MAX-ER Luffer worked with Titan Construction to fabricate the bag house for a power plant in Gillette, WY. Due to the confined work space, the MAX-ER was at 90% of the rated capacity and boom clearance was at a minimum. The lift took approximately two hours and at the end of the project, the client was very happy with a job well done by Lampson.