Plant Vogtle Calendar Photo 2017

Project Overview

Lampson International deployed a Transi-Lift LTL-2600 to replace a steam generator at Plant Vogtle in Waynesboro, Georgia. This precision lift required careful planning, heavy-lift expertise, and a reliable crane configuration to safely execute the operation.

Key Equipment & Operations

  • Lampson Transi-Lift LTL-2600
  • 400 feet of main boom and 20-foot jib
  • Engineered rigging for safe replacement of the steam generator

Project Highlights

  • Replaced a critical steam generator with precision
  • Utilized the Transi-Lift for high-capacity, high-reach lifting
  • Completed lift safely and on schedule

PROJECT DETAILS

Categories:
Client: Southern Company
Location: Waynesboro, GA
Completed: 2018