In late 2024, Lampson partnered with PMI and Vertical Options to lift and position five modular tower components—each weighing approximately 10,000 lbs and measuring 40 feet in length—inside an elevator shaft for a man lift system in a Washington grain tower. The project also included the installation of a modular machine room.
Using a Lampson Manitowoc 14000 crane configured with 230 feet of boom and a 50-foot fixed jib, the team performed precision lifts within an extremely tight workspace. To protect the rail tracks below, the crane was set on custom 4×16 Lampson-fabricated steel mats, engineered to distribute load safely and maintain stability.